Schindler, Münchendorf near Vienna (AUT)

Year of construction 2014.

DVC 2 has been installed between 4 outdoor silos. It is supplied from one of the hopper silos with the help of a short transfer screw. In front of DVC 2 a buffer is installed. Subsequent enclosure of DVC 2 offers additional protection and usable space that would otherwise be lost. DVC2 is therefore not visible from the outside and in a place that would otherwise not have been usable.